TNEI advise on wind farm repowering, replanting and extension options
TNEI staff have recently undertaken a detailed feasibility assessment on behalf of a wind farm operator to consider various redevelopment options for an existing site in the north of England. This included consideration of the use of reconditioned turbines which can offer the advantage of lower project investment and shorter payback periods. The assessment considered data collected to support the original planning application, along with operational data collected from the turbines, to assess the feasibility of repowering the turbines using new hardware of a similar size; replanting of the site with newer larger turbines; and adding an extension to the existing site. As well as technical and environmental considerations, TNEI also undertook initial financial modelling and liaison with a broker of reconditioned wind turbines. TNEI are continuing to work with the operator to progress with the best option. The work is being lead by Claire Hughes TNEI’s Programme Manager who