TNEI is delighted to share the successful delivery of a full UK Grid Code Compliance (GCC) study and model submission for a co-located Battery Energy Storage System (BESS) and Solar PV project.
The project combined solar generation and battery storage on a shared grid connection, creating a coordinated hybrid energy system that required specialist technical expertise and a robust compliance approach.
With hybrid and co-located assets accelerating across global energy markets, the need for accurate modelling, robust compliance and clear technical direction has never been more important for developers.
As a long-standing client, the developer trusted TNEI’s proven track record in delivering hybrid-site projects. Our role was to ensure that both technologies operated seamlessly – individually and together – providing a compliant and low-risk route to grid connection.
Our work followed the latest industry requirements outlined in the Electro-Magnetic Transient (EMT) Models Guidance Note and the Co-location Guidance Note, ensuring alignment with current UK Grid Code standards.
Whether you are in the early planning stages or navigating complex Grid Code requirements, TNEI’s experienced consultants provide clear, practical support at every stage of your project.
Our services include:
- Grid Code Compliance (GCC) studies
- Root Mean Square (RMS) and Electro-Magnetic Transient (EMT) model development and submission
- Model validation and verification
- Sub-synchronous Oscillation (SSO) requirements
From initial feasibility through to final energisation, we work closely with our clients to deliver solutions built on clarity, collaboration, and technical excellence.
If you are developing a co-located energy project and need support with Grid Code compliance or modelling, our team is here to help.
Get in touch with our experts here