TNEI reviewed a portfolio of South American operational and in-construction wind projects totalling over 700MW in capacity. The review comprised an initial red flag review followed by a detailed assessment. The client used TNEI’s assessment to determine OPEX risks and refine their bid for acquisition of the portfolio. TNEI identified risks associated with grid curtailment which led to reduced generation export and revenue losses and also identified issues with the electrical site infrastructure design which presented potential risks to the safe and efficient operation and maintenance of the projects.